Application for New Water and/or Wastewater Service Connection

Important Information

  • Applications must be submitted at least four weeks before the requested installation or connection date.
  • Once your application is received, Engineering & Planning will review it and contact you if additional information is needed.
  • You will receive a letter from the Municipality advising whether your application has been approved or denied.
  • If approved, you will receive a Letter of Approval.
    • This letter must be taken to the Eastern District Planning Commission to obtain a building permit.
    • Approval for new services or connections related to new construction is only valid with an active building permit.
    • To learn more about building permits, visit: Planning & Development | Municipality of the County of Inverness
  • Installation scheduling depends on:
    • Staff availability
    • Contractor availability (if required)
    • Emergency situations, which may cause delays
  • Service installations are completed during the annual construction season (May to October).
  • Once construction of the residence or building is complete, you must open a water utility account.
    • This allows you to:
      • Set up billing for the property
      • Schedule installation of a water meter
  • You can apply to open a water utility account here.

Need Help?

If you have questions or need assistance, please email water.sewer@invernesscounty.ca or call 1-866-258-0223, select option #4.

Property Information

Civic Address (if available):
If this request for a planned subdivision or large-scale development?

Applicant Information

Name:
Mailing Address:
Preferred method of contact:
Are you the property owner:
If no, a signed letter from the property owner granting permission to submit an application on their behalf is required.

Contractor Information

Name:

Authorization

By clicking this box, you acknowledge that the information included is true, accurate, and complete to the best of your knowledge.

Description of Service Request

Water
(minimum ¾”)
Wastewater
(minimum 4")
Building Type
Drag & Drop Files, Choose Files to Upload
Will proposed water or wastewater services cross another property?

If not submitted online, this form can be mailed or delivered to:

Municipal Administration Building
Attention: Public Works
375 Main St,
Port Hood, NS
B0E 2W0

Open Monday to Friday, 8:30 a.m. – 4:00 p.m.